Can We help you?

Follow Us

hrk logo
HomeNewsIntegrated Glass & Aluminum Systems – Four Points by Sheraton, Guyana
ProjectsConstruction & Engineering

Integrated Glass & Aluminum Systems – Four Points by Sheraton, Guyana

Pedro Rojas
Pedro Rojas

HRK delivered the full design, fabrication, and installation of architectural glass and aluminum systems for the Four Points by Sheraton hotel in Georgetown, Guyana, supporting both the building’s performance and its contemporary design.

The project included curtain wall facade systems, window systems, sliding doors, shower enclosures, and interior glass elements, all executed under international quality and performance standards.

Four Points by Sheraton hotel in Georgetown, Guyana, featuring modern facade design with architectural glass and aluminum systems.
Four Points by Sheraton Georgetown, Guyana — modern facade integrating high-performance glass and aluminum systems.

Project Overview

  • Location: Georgetown, Guyana
  • Duration: 6 months
  • Total Investment: USD 1,000,000

Scope of Work

Curtain Wall Facade System: Design, supply, and installation of a structural aluminum facade system (Serie 60 – Alumina), incorporating high-performance double-glazed glass with solar control and thermal efficiency.

Window Systems: Installation of operable and fixed window systems (868 SABIATTO) with insulated Pilkington glass, providing strong thermal and acoustic performance.

Sliding Door Systems: Implementation of sliding door systems (model 86 SABIATTO) in multiple configurations, aligned with the architectural design of the hotel.

Shower Enclosures & Interior Glass: Supply and installation of tempered glass shower cabins, mirrors, and complementary interior glass elements, ensuring durability and refined finishes across all spaces.

Four Points by Sheraton Georgetown showcasing glass door systems, windows, and architectural aluminum installations across hotel spaces.
Integrated glass systems in operation, including sliding doors, window systems, and interior applications across key hotel areas.

Execution & Scale

The project included approximately 2,800 m² of installed glass systems, encompassing curtain wall facade, windows, doors, mirrors, shower enclosures, and other interior glass elements across guest rooms and common areas.

Delivered on schedule, the solution ensures long-term durability, energy efficiency, and operational reliability.

Conclusion

This project demonstrates HRK’s ability to deliver integrated architectural systems that combine engineering precision, high-quality materials, and design consistency, meeting the demands of international hospitality brands.

Image Credits: Images courtesy of Four Points by Sheraton Georgetown, Marriott International.

logo hrk

HRK Global Trade main contracting center is located in Miami, United States with local and representative offices located in Panama City, Panama and Ciudad Guayana, Venezuela.

Our address

Calle 55, PH SFC. Oficina 26D

Obarrio, Panama City, Panamá

2026 © All rights reserved.